Flagship mandates across refining, storage, pipelines, gas processing and asset integrity, and the results we delivered for our clients.

12,000BPD refinery
2EPC contractors overseen
FEED · PMC

Azikel Refinery Project

ClientAzikel Petroleum
LocationNigeria
Period2020 – ongoing

FEED and EPC-phase project management for a new 12,000 BPD refinery adjacent to the Shell Gbarain-Ubie gas gathering station.

Scope of work

  • 12,000 BPD capacity, designed to produce PMS at 6,474 BPD and diesel at 4,645 BPD
  • FEED delivered in the first phase, with MOD acting as PMC throughout
  • Operations scope covering pre-commissioning, commissioning and maintenance
OutcomeAdvanced from FEED into EPC execution. MOD remains engaged as PMC, overseeing two EPC contractors (McDermott and Hi-Tech) across process units, utilities and offsites.
9configurations evaluated
1evidenced investment case
Feasibility

Grassroot Refinery Project

ClientNorth Light Holding · Owner: North Oil Holding / MNR
LocationKurdistan Region, Iraq
Period2025

Comprehensive feasibility study for a grassroot refinery processing a medium-heavy, high-sulphur crude with bottom valorisation.

Scope of work

  • Nine refinery configurations studied and evaluated in detail
  • Full CAPEX and OPEX analysis carried out for each configuration
  • Crude assay and product slate assessment against regional demand
OutcomeThe optimal investment path was identified and the configuration with the strongest return profile selected, giving the owner a single evidenced basis for the investment decision.
50,000BPD refinery
2countries
Assessment · FEED

MOL Mantova Refinery Relocation

ClientZR Energy
LocationItaly / United Arab Emirates
Period2014

Assessment and FEED for the relocation of the Mantova refinery, which had been shut down in 2014, to a new location.

Scope of work

  • Detailed process study to confirm the refinery could process the crudes available at the new location
  • LP modelling and economics
  • Inspection of main equipment with residual-life analysis
OutcomeRelocation confirmed as technically viable, and FEED completed for the new 50,000 BPD refinery, including on-site equipment inspection to establish what could be re-used.
11 kmfirewater network
19tanks protected
Engineering · Procurement

Es-Sider Fire Water Ring & Auto-Fixed Foam

ClientIntech · Owner: Waha Oil Company
LocationLibya
Period2024 – 2025

Engineering and procurement for a three-layer loss prevention system (3LLPS) across a nineteen-tank farm at the Es-Sider terminal.

Scope of work

  • 11 km of firewater network piping (12" and 10") with hydrants and monitors for nineteen tanks
  • Sprinkler cooling, auto-foam deluge with six bladder tanks, and rim-seal gas extinguishing on ten tanks
  • New firewater pump house: one electric and two diesel-driven pumps plus two jockey pumps
  • Fire alarm system, MCC room, diesel generator, cathodic protection and linear fire detection
OutcomeA complete replacement loss-prevention system engineered and procured for a live export terminal, restoring fire protection across the full tank farm.
440,000 m³storage capacity
19tanks: 14 new, 5 rehabilitated
FEED · PMC

TOIL Terminal — Tripoli Tank Farm

ClientMME · Owner: Rosneft
LocationLebanon
Period2019 – 2020

FEED design and PMC services for the optimisation of the TOIL Terminal at the Tripoli Tank Farm.

Scope of work

  • Rehabilitation of five existing tanks and construction of fourteen new tanks
  • New truck loading area, pump station and supporting facilities
  • New piping, electrical, instrumentation and telecommunication networks
  • Operation and maintenance procedures updated for the new facilities and assets
OutcomeApproximately 440,000 m³ of combined diesel, gasoline and fuel oil storage designed and taken through FEED, with MOD providing owner-side PMC into the EPC phase.
ADNOCnational oil company
Fullprocess, civil & piping design
Detailed design

ASAB New Well Pad & Facilities Upgrade

ClientCH2M Hill · Owner: ADNOC
LocationUnited Arab Emirates
Period2015 – 2016

Detailed design for a new well pad and the upgrade of the existing gathering centre at the ASAB field.

Scope of work

  • Complete process design for the new well pad
  • Civil and piping design for both the new pad and the existing facilities
  • Topographic and geotechnical surveys carried out under MOD’s responsibility
OutcomeDetailed design completed for the upgrade of the existing gathering centre to increase oil production, delivered for a national oil company through a tier-one engineering partner.
Selected projects

Asset integrity in practice

Assessments carried out to API, ASME, DNV and BS, using finite element analysis where the duty demands it.

Asset integrity

Tanks and Spheres Structural Assessment

Tüpraş · Türkiye · 2022 – 2023
  • Seismic structural assessment of atmospheric tanks using innovative methodologies
  • FEA and sloshing modelling across 45 product tanks over two phases
  • Mechanical design and assessment of LPG and methane storage spheres of various types and sizes
Asset integrity

Coke Drum Fitness-For-Service

OMV · Romania
  • Verification of stability, fatigue and creep-fatigue for equipment at high temperature under cyclic thermal loading
  • Bulging and “banana effect” simulation
  • Creep material models with specific user-material subroutines in Abaqus and Ansys